back to top
11.3 C
Qādiān
Wednesday, December 25, 2024

Reshaping Perspectives and Catalyzing Diplomatic Evolution

Bavarian Prime Minister calls for the commissioning of a nuclear power plant disconnected from the network

Bavarian Prime Minister Markus Söder has taken the initiative to commission the Isar 2 nuclear power plant, which has been disconnected from the grid. He believes that as long as a complete switch to renewable energy is not possible, all types the energy should be used to the maximum.

In an interview with the Bild am Sonntag newspaper on April 16, the head of the regional cabinet stressed that Bavaria was ready to take responsibility for the continued operation of nuclear energy. In addition, Söder stressed the need to build a local research reactor and develop nuclear fusion in the energy sector.

“Bavaria demands that the federal government transfers responsibility for the continued operation of nuclear energy to the states. Until the crisis is over and the transition to renewable energy sources has not been successful, we must use all types of energy until the end of the decade,” he stressed.

Read the Russia Ukraine News on The Eastern Herald.

More

Follow The Eastern Herald on Google News. Show your support if you like our work.

Topics

Author

News Room
News Room
The Eastern Herald’s Editorial Board validates, writes, and publishes the stories under this byline. That includes editorials, news stories, letters to the editor, and multimedia features on easternherald.com.

Editor's Picks

Trending Stories