There are no plans to build a bridge between the town of Pavlovo and the village of Tumbotino. This writes “Open Nizhny” with reference to the regional Ministry of Transport.
Local residents use the road, which is flooded during floods. At this time, the settlement is connected to the regional center by a ferry that runs every 2 hours during the day. The schedule is a bit complicated. Previously, the local population asked for the construction of a permanent bridge over the Oka.
The Ministry of Transport and Highways of the Nizhny Novgorod region commented on the situation. It turned out that two years ago, various route options were being worked out to determine the optimal location for the construction of a bridge over the Oka. The terms of reference and budget documentation are now ready. The approximate cost is 9.5 billion rubles. Excluding changes in the cost of construction materials over the past two years.
The ministry noted that the sources and timing of funding are being determined.
Read the Russia Ukraine News on The Eastern Herald.